1. Definitions
In these conditions:
“Customer” means the person or business that requests, books, consigns, or authorises carriage of Goods.
“Goods” means the items, products, packs, pallets, crates, packaging, dunnage, gluts, strapping, banding, labels, and handling equipment presented for carriage.
“Packing Requirements” means any written packaging, preparation, support, restraint, labelling, or handling requirements published by Dingo or provided to the Customer before or at the time of booking, including the Sheet Pack Packing Requirements in the annex to these conditions.
“Crane Delivery” means a delivery booked for unloading using a crane truck, crane, Hiab, knuckle boom, or similar mechanical lifting equipment.
“Inadequate Packaging” means a failure by the Customer, or a third party engaged or authorised by the Customer, to prepare, support, restrain, protect, label, declare, or present the Goods to the standard reasonably necessary for:
- the nature, weight, dimensions, fragility, value, and stacking configuration of the Goods;
- the transport method and route;
- normal loading, handling, restraint, and unloading;
- the Crane Delivery method requested or selected by the Customer; and
- any applicable Packing Requirements.
2. Customer responsibility for packaging
2.1 The Customer is responsible for ensuring that all Goods presented for carriage are adequately packaged, secured, supported, restrained, protected, labelled, and prepared to withstand the normal and reasonably foreseeable conditions associated with transportation, loading, handling, storage, and unloading.
2.2 Packaging must be suitable for the nature, weight, dimensions, fragility, value, stacking configuration, and handling characteristics of the Goods, together with the delivery, unloading, and crane method requested at the time of booking.
2.3 The Customer must ensure that Goods comply with any applicable Packing Requirements, whether the Goods are packed by the Customer, its employees, contractors, suppliers, manufacturers, or other third parties.
2.4 Where Goods are packed or prepared by a third party, the Customer remains responsible for ensuring that the Goods comply with the applicable Packing Requirements and are suitable for the requested transport and unloading method.
2.5 Where there is a conflict between the Customer’s instructions and Dingo’s Packing Requirements, the Customer must obtain Dingo’s written approval before collection.
2.6 The Customer is responsible for the cost of packaging, dunnage, gluts, edge protection, corner protection, separators, strapping, banding, shrink wrap, pallets, crates, lifting attachments, and any other materials required to prepare the Goods for carriage and the requested unloading method.
2.7 The Customer must not present Goods in a condition that is unsafe, unstable, likely to cause injury, likely to damage other freight, or unsuitable for the booked transport or unloading method.
3. Customer declarations
3.1 By booking a delivery, the Customer declares and warrants that:
- the Goods have been packed, supported, restrained, and protected to a standard reasonably suitable for the transport, loading, storage, and unloading method requested;
- the declared weight, dimensions, product type, quantity, fragility, and stacking configuration are accurate;
- all special handling, lifting, access, protection, and safety requirements have been disclosed to Dingo before collection;
- the Goods do not contain prohibited, dangerous, hazardous, illegal, or undisclosed items; and
- the Customer has authority to consign the Goods for carriage.
3.2 For a Crane Delivery, the Customer must disclose before collection, where applicable:
- whether any sheets, boards, panels, or other products protrude beyond the supporting base or pack edges;
- the pack configuration, sheet sizes, weight, and centre of gravity where known;
- the location and adequacy of edge protection;
- approved lifting points, if any;
- approved sling type and sling positions;
- whether a spreader bar, lifting frame, or other specialised equipment is required;
- any handling restrictions, including restrictions on chains, choker slings, bare hooks, direct sling contact with exposed sheet surfaces, dragging, twisting, or pivoting; and
- any site access, overhead clearance, ground condition, or unloading restriction.
3.3 Dingo may refuse collection, postpone collection, require rectification, require an alternative handling method, or charge a reasonable administration or delay fee where the Customer does not provide information reasonably required for Dingo to assess the booking.
4. Minimum pack preparation standards
4.1 General standard
All packs must be prepared in accordance with applicable load-restraint requirements, relevant manufacturer handling instructions, any applicable Packing Requirements, and the principles in the current National Heavy Vehicle Regulator Load Restraint Guide.
A pack must be stable, consolidated, and capable of being handled as a single unit without individual products sliding, separating, fanning out, or becoming displaced during normal loading, transport, braking, cornering, unloading, or crane handling.
Securing individual products into a stable pack is separate from restraining the pack to the vehicle. Packaging and unitising do not replace the need for appropriate vehicle load restraint.
4.2 Gluts, dunnage and pack support
Where a pack requires support for loading, transport, storage, or crane unloading, the Customer must supply correctly sized, positioned, and appropriately rated timber gluts, dunnage, pallets, bearers, or equivalent suitable supports.
Gluts and supports must:
- be strong enough to support the full weight of the pack without crushing, splitting, rolling, collapsing, or deforming;
- be positioned at intervals suitable for the product’s weight, dimensions, and structural characteristics;
- prevent excessive bending, sagging, twisting, or unsupported product edges;
- provide stable support throughout loading, transport, and unloading;
- provide safe clearance and access for lifting equipment;
- not interfere with the vehicle’s load-restraint system; and
- be suitable for the Crane Delivery method requested by the Customer.
Packs must be constructed so that individual products cannot slide forward, separate, become displaced, or protrude dangerously during normal transport or handling.
Gluts, dunnage, and packaging must not be relied upon as a substitute for appropriate restraint of the Goods to the vehicle.
4.3 Strapping and banding
All packs must be adequately strapped, banded, shrink-wrapped, or otherwise secured to maintain structural integrity throughout loading, transport, handling, and unloading.
Strapping and banding must:
- be appropriate for the weight, dimensions, product type, and handling characteristics of the Goods;
- be correctly positioned and sufficiently tensioned;
- prevent individual sheets, boards, panels, or products from shifting, separating, sliding, or fanning out;
- remain secure and effective throughout normal transport and handling;
- be protected from sharp edges, abrasion, and conditions likely to cause failure;
- not create a hazard to Dingo personnel, equipment, or other freight; and
- not be treated as a certified lifting attachment unless specifically designed, rated, and approved for that purpose.
Loose, insufficient, damaged, incorrectly positioned, or ineffective strapping is not acceptable.
4.4 Edge protection
Pallets and packs containing soft, flexible, fragile, compression-sensitive, easily marked, or damage-sensitive materials, including plasterboard, fibre cement, insulation boards, decorative panels, cladding, and similar products, must have suitable edge protection wherever lifting slings, chains, restraint equipment, or other handling equipment may apply pressure to the Goods.
Edge protection must:
- be placed at both the top and bottom of the pack where slings or restraints may bear on the Goods;
- be strong, rigid, and broad enough to distribute anticipated contact pressure;
- cover all reasonably exposed edges and corners;
- prevent cutting, crushing, indentation, bending, chipping, abrasion, or other foreseeable damage;
- be compatible with the product and lifting method; and
- not rely on the product itself to withstand concentrated sling pressure.
4.5 Protruding sheets and unsupported edges
Sheets, boards, panels, and similar products must not protrude beyond the supporting base or pack edges unless:
- the protrusion is necessary for the product configuration;
- the protruding section is adequately supported or protected;
- the protruding section is protected against sling contact, abrasion, crushing, bending, and impact;
- the pack remains stable and restrained during normal handling; and
- the protrusion has been disclosed to Dingo before collection.
Thin, fragile, flexible, or damage-sensitive sheets must not be left with unsupported edges exposed to crushing, bending, or sling pressure during lifting.
Where mixed-size sheets, boards, or panels are packed together, the Customer must ensure that heavier, narrower, or stronger products do not transfer concentrated loads onto thinner, weaker, or inadequately supported products.
A pack must not be assembled in a configuration where damage is reasonably foreseeable from the normal and appropriate unloading method requested by the Customer.
5. Crane truck deliveries
5.1 Where a Crane Delivery is booked, the Customer must ensure that the Goods are suitably prepared, supported, restrained, and protected to permit safe unloading using appropriate crane lifting equipment, including lifting slings and other suitable lifting attachments.
5.2 The Customer must ensure that Goods are protected against reasonably foreseeable compression, movement, contact pressure, abrasion, cutting, bending, crushing, and other forces associated with the proper use of the selected lifting method.
5.3 Where specialised lifting equipment, designated lifting points, additional protection, specific sling placement, spreader bars, lifting frames, or particular handling procedures are required, these requirements must be disclosed to Dingo before collection and appropriate arrangements agreed.
5.4 Before crane unloading, Dingo’s driver or crane operator will carry out the pre-lift safety assessment described in clause 8.1.
5.5 Dingo will use a lifting method, equipment, slings, and attachments that are safe, compatible with the nature, weight, dimensions, fragility, and handling characteristics of the Goods, and consistent with:
- the Customer’s disclosed handling requirements;
- any applicable manufacturer handling instructions known to or provided to Dingo;
- any applicable Packing Requirements;
- applicable work health and safety requirements; and
- good industry practice for the type of Goods and Crane Delivery method.
5.6 The Customer must not direct, request, or authorise Dingo to use a lifting method, equipment, sling placement, or handling procedure that Dingo reasonably considers unsafe, incompatible with the Goods, or inconsistent with applicable handling instructions or safety requirements.
5.7 Dingo will not drag, drop, pivot, twist, crush, or otherwise handle Goods in a manner reasonably likely to cause damage, except where necessary to avoid an immediate safety risk.
5.8 Dingo may refuse to lift, unload, or handle Goods where the pack, lifting method, equipment, site conditions, or Goods condition makes the operation unsafe or unsuitable.
6. Pre-collection inspection and records
6.1 Before collection, Dingo’s driver or authorised representative will, where reasonably practicable, watch, inspect, and assess the Goods and packaging for obvious defects, instability, inadequate protection, unsafe presentation, or other issues that may create a foreseeable risk of damage during transport or unloading.
6.2 Where Dingo identifies an issue that may create a foreseeable risk of damage, Dingo will advise the Customer where reasonably practicable and may:
- require rectification before collection;
- reject the collection;
- require a different handling method; or
- refuse carriage or crane unloading.
6.3 Where practicable, Dingo may photograph or video the Goods before collection, including the pack configuration, base, gluts, dunnage, strapping, corners, edges, labels, exposed product surfaces, protruding product, and any visible pre-existing damage.
6.4 Dingo may retain and use photographs, video, notes, checklists, signatures, consignment documentation, and other records for safety, operational, claims, insurance, and legal purposes.
6.5 Dingo’s inspection is limited to a reasonable visual inspection of readily observable defects and obvious safety risks. Dingo is not required to dismantle packs, test packaging, weigh Goods, inspect internal layers, certify structural adequacy, or assess hidden defects.
6.6 Dingo’s acceptance of Goods, assistance with inspection, failure to identify a deficiency, or failure to reject a pack does not constitute certification that the Goods are adequately packaged or suitable for carriage or unloading.
6.7 Acceptance does not transfer responsibility for the original packaging, preparation, support, restraint, or protection of Goods from the Customer to Dingo.
7. Rejection and rectification
7.1 Where a driver or authorised representative identifies packaging deficiencies, inadequate product protection, unsafe pack preparation, or unsuitable load preparation that presents a foreseeable risk of damage during transportation or unloading, Dingo may:
- reject the collection;
- require the Customer to repack, secure, protect, label, or otherwise rectify the Goods; or
- require an alternative, properly assessed handling method before proceeding.
7.2 Dingo will notify the Customer of the specific issue and required corrective action where reasonably practicable.
7.3 Where a deficiency is identified, Dingo will photograph or video it where reasonably practicable and notify Dingo’s operations team so that the issue and required corrective action are recorded.
7.4 The Customer is responsible for rectifying identified deficiencies at its own cost.
7.5 Dingo may refuse to collect, load, transport, or unload Goods until they are suitably prepared for the intended transport and unloading method.
7.6 A Customer instruction, request, or approval does not make unsafe, unstable, inadequately protected, or unsuitably prepared Goods acceptable for carriage or crane unloading. Dingo may decline to proceed with carriage or crane unloading until the Goods are rectified or Dingo has assessed and approved an alternative safe handling method.
7.7 Where an alternative handling method is available and safe, Dingo may agree to that method only after assessing the Goods, pack configuration, lifting equipment, sling placement, site conditions, and applicable handling requirements. Any additional cost remains the Customer’s responsibility.
8. Pre-lift safety assessment and records
8.1 Before crane unloading, Dingo’s driver or crane operator must conduct a reasonable safety assessment of:
- the pack configuration and stability;
- lifting points and sling placement;
- edge protection and contact points;
- lifting equipment and attachments;
- site access, ground conditions, and overhead clearance;
- load restraint; and
- any visible pre-existing damage.
8.2 Where practicable, Dingo may photograph or video the Goods before lifting, including the pack, lifting equipment, sling type, sling placement, contact points, edge protection, lifting points, load restraint, crane truck, unloading area, and any visible pre-existing damage.
8.3 Dingo may retain and use photographs, video, notes, checklists, and other records created before, during, or immediately after crane unloading for safety, operational, claims, insurance, and legal purposes.
8.4 If the pack, lifting method, equipment, or site presents a foreseeable risk of damage, Dingo will advise the Customer before lifting where reasonably practicable.
8.5 The Customer must provide a reasonable opportunity to rectify the issue, provide alternative lifting instructions, or arrange alternative equipment where reasonably practicable.
8.6 Dingo may suspend, refuse, or discontinue unloading where the condition, packaging, preparation, site access, or lifting method makes the operation unsafe or unsuitable.
9. Damage during carriage
9.1 Dingo will perform carriage, loading, restraint, transport, unloading, and crane-handling services with reasonable care and skill.
9.2 Dingo is responsible for loss or damage to the extent caused by:
- Dingo’s negligence;
- Dingo’s breach of these conditions;
- Dingo’s failure to follow an agreed handling instruction;
- use of lifting equipment or a lifting method not reasonably appropriate for the Goods or the booked service; or
- improper loading, restraint, transport, or unloading.
9.3 To the extent permitted by law, Dingo is not responsible for loss or damage to the extent attributable to:
- Inadequate Packaging;
- insufficient protection;
- incorrectly positioned, undersized, weak, or unstable gluts or dunnage;
- inadequate pack strapping or banding;
- unsupported sheet edges or protruding product;
- unsuitable freight preparation;
- inaccurate or incomplete Customer declarations;
- undisclosed handling requirements;
- pre-existing damage;
- inherent vice, latent defect, or natural deterioration of the Goods; or
- events outside Dingo’s reasonable control.
9.4 Where both the Customer’s packaging or preparation and Dingo’s handling contribute to loss or damage, responsibility will be apportioned according to each party’s contribution to the damage.
9.5 Nothing in these conditions excludes or limits liability that cannot lawfully be excluded or limited.
10. Claims process
10.1 Visible damage must be noted on the delivery documentation where practicable and notified to Dingo within 14 days after delivery.
10.2 Concealed damage not apparent at delivery must be notified to Dingo as soon as reasonably practicable after discovery, and in any event within 14 days after delivery, unless the Customer provides indisputable evidence that the damage occurred while the Goods were in Dingo’s custody or control.
10.3 A formal claim, including the information required by clause 10.4, must be lodged within 14 days after notification under clause 10.1 or 10.2, as applicable.
10.4 A claim should include:
- the consignment or booking reference;
- delivery date and address;
- photographs of the damage;
- photographs of the packaging, pack, gluts, dunnage, strapping, labels, and remaining packaging materials;
- a description of the damaged Goods;
- the quantity and value of damaged Goods;
- the claimed amount;
- evidence of purchase cost or replacement cost;
- details of the alleged cause of damage; and
- any other information reasonably required to investigate the claim.
10.5 The Customer must preserve the Goods, packaging, gluts, dunnage, strapping, banding, labels, and damaged products in the condition received until Dingo has had a reasonable opportunity to inspect them.
10.6 The Customer must not repair, alter, dispose of, return, or otherwise deal with damaged Goods before Dingo has had a reasonable opportunity to inspect them, unless necessary to prevent further loss, safety risk, or deterioration.
10.7 Dingo may decline, reduce, or defer a claim where the Customer:
- fails to notify Dingo within the applicable period;
- fails to provide reasonable evidence;
- fails to preserve the Goods or packaging;
- prevents inspection;
- repairs, alters, or disposes of the Goods before inspection; or
- cannot establish that the damage occurred during Dingo’s custody or control.
10.8 Claims will be assessed through Dingo’s established investigation process, having regard to the booking information, Packing Requirements, available photographs, driver notes, lifting method, equipment used, delivery documentation, and the condition of the Goods.
10.9 Dingo may refer a claim to its insurer or another relevant party for assessment, investigation, or determination. Dingo’s role in collecting information or facilitating an investigation does not constitute an admission of liability.
10.10 The claim notification and formal claim periods in this clause are subject to any different period expressly agreed in the applicable customer agreement.
11. Evidence and records
11.1 Dingo may rely on its booking records, customer declarations, driver notes, photographs, video, GPS data, delivery documentation, equipment records, and incident reports when assessing claims.
11.2 Where Dingo performed crane unloading, Dingo may provide, on reasonable request:
- the lifting method used;
- the type of lifting equipment and slings used;
- sling placement and contact points;
- available photographs or video;
- driver or operator details;
- incident reports; and
- other relevant records held by Dingo.
11.3 Dingo will provide available information under clause 11.2 within a reasonable time, subject to privacy, safety, commercial confidentiality, insurance, and legal requirements.
12. Liability
12.1 Subject to clause 12.3, Dingo’s total liability for loss or damage to Goods is limited to the lesser of:
- the reasonable cost of repairing the damaged Goods;
- the reasonable cost of replacing the damaged Goods; or
- the invoice value of the damaged Goods.
12.2 Dingo is not liable for indirect, consequential, economic, or loss-of-profit claims, including loss of production, loss of contract, delay costs, liquidated damages, or loss of business opportunity.
12.3 Nothing in these conditions excludes or limits liability or a statutory duty that cannot lawfully be excluded or limited.
12.4 The parties may agree a separate monetary cap per consignment, pack, tonne, or claim in the applicable customer agreement, quotation, or booking confirmation. Any such cap must be clearly expressed and must not apply to liability that cannot lawfully be limited.
13. Customer indemnity
13.1 The Customer indemnifies Dingo against all claims, losses, costs, expenses, and liabilities arising from:
- Inadequate Packaging;
- inaccurate or incomplete declarations;
- unsafe pack preparation;
- undisclosed handling requirements;
- prohibited or dangerous Goods;
- damage caused by the Customer’s packaging, preparation, loading, or restraint; or
- the Customer’s breach of these conditions,
to the extent the loss, damage, claim, or liability was caused by, or materially contributed to by, those matters.
13.2 This indemnity does not apply to, and must not be read as covering, any fine, penalty, or other monetary penalty imposed under any work health and safety law, work health and safety regulation, or other applicable legislation.
13.3 The Customer must notify Dingo promptly of any claim made by a third party arising from the Goods, their packaging, or their handling.
14. Unsafe or unsuitable loads
14.1 Dingo may suspend, refuse, or discontinue loading, transportation, or unloading where the condition, packaging, preparation, weight, dimensions, stability, labelling, site access, or handling method makes the proposed operation unsafe or unsuitable.
14.2 Where additional packaging, alternative lifting arrangements, specialised equipment, additional personnel, or a different delivery method is required, the Customer is responsible for arranging an appropriate solution.
14.3 Any additional charges will be managed in accordance with the agreed transport contract, quotation, booking confirmation, or Dingo’s applicable charges.
15. Application, acceptance and variation
15.1 These conditions apply to a booking, consignment, or carriage service only to the extent that they have been accepted by, or expressly incorporated into an agreement with, the relevant Customer.
15.2 Where Dingo has a written agreement with the Customer, including a supply, transport, distribution, or customer agreement, that agreement prevails over these conditions to the extent of any inconsistency.
15.3 These conditions apply to a Customer with a written agreement only to the extent they are incorporated into that agreement or otherwise accepted in accordance with its terms.
15.4 Where these conditions are made available before or at the time of booking, the Customer is taken to accept them by requesting, confirming, or authorising the booking, unless the Customer has expressly agreed otherwise in writing.
15.5 Dingo may update these conditions or any Packing Requirements from time to time. An updated version applies only to bookings made after the updated version has been published or notified to the Customer, and only to the extent permitted by the applicable customer agreement and law.
15.6 These conditions do not vary an existing agreement unless the variation is agreed in accordance with that agreement.
15.7 These conditions are governed by the laws of Queensland and the Commonwealth of Australia. The parties submit to the non-exclusive jurisdiction of the courts of Queensland.
15.8 If any part of these conditions is invalid or unenforceable, the remaining provisions continue to apply to the extent permitted by law.
Annex
Sheet Pack Packing Requirements
These requirements form part of the Packing Requirements for sheets, boards, panels and similar products.
Pack support
- Provide adequate support along the length of the pack using appropriately positioned gluts, dunnage, pallets, or bearers.
- Position supports at intervals suitable for the product’s weight, dimensions, and structural characteristics, and consistent with manufacturer handling instructions.
- Prevent excessive bending, sagging, twisting, or unsupported product edges.
- Do not allow thin, flexible, fragile, or damage-sensitive sheets to protrude beyond the supporting base.
- Ensure the pack remains stable during loading, transport, braking, unloading, and crane lifting.
Sheet arrangement
- Keep sheets aligned, flush, and restrained.
- Prevent individual sheets from sliding, fanning out, separating, or becoming displaced.
- Do not place heavier or narrower sheets in a way that transfers concentrated load onto thinner, weaker, or unsupported sheets.
- Use separators, packing materials, gluts, or other supports where mixed-size sheets require additional support.
Strapping and protection
- Strap or band the pack at approved positions with adequate tension.
- Do not rely on shrink wrap alone to restrain heavy or unstable sheet packs.
- Use edge protection wherever slings, chains, or restraint equipment may contact the pack.
- Protect all exposed corners, edges, and faces susceptible to abrasion, crushing, chipping, or bending.
- Do not rely on the product itself to withstand concentrated sling pressure.
Crane delivery
- Crane unloading must be disclosed at booking.
- Disclose any required lifting points, spreader bar, lifting frame, or specialised equipment.
- Disclose any prohibited lifting methods or handling restrictions.
- Ensure slings do not bear directly on exposed sheet edges or faces unless suitable edge protection is used.
- Dingo may refuse to lift a pack that is unstable, inadequately protected, or unsafe to handle.
Labels
Apply clear labels where applicable:
- Crane unload
- Fragile
- Fragile edges
- No chains
- No choker slings
- Do not drag
- This side up
- Lifting-point markings, where applicable